Plans / Drawings · Requirement 13 of 27
Vertical sections showing relationships between levels and spaces
Cross and longitudinal sections: basement under the podium, double-height lobby, mezzanine, first floor, five guest floors and the roof venues.
Answer
Cross and longitudinal sections (R10, attached), coloured by use, showing how the levels and spaces connect. Levels from ground floor +/-0.00: basement -4.50; ground +/-0.00 (double-height lobby to the mezzanine); mezzanine +4.50; first / podium roof decks +8.00; guest floors 2nd-6th +12.00, +16.00, +20.00, +24.00, +28.00 (4.00 m floor to floor); roof venues +32.00; upper roof +36.00; parapets 1.8 m. The basement runs under the whole podium.
Datum: ±0.00 = the normal road level; the hotel ground floor is at road level. Check against the Revit section A-13, which measures from the 2nd floor (0.000): ground -12.000, mezzanine -7.500, 1st -4.000, 2nd 0, 6th +16.000, roof deck +20.000, apex +24.000 – adding 12.00 m gives ground ±0.00, mezzanine +4.50, 1st +8.00, 2nd +12.00, 6th +28.00, roof deck +32.00, upper roof (apex) +36.00, exactly as above. Floor to floor: 4.50 / 3.50 / 4.00 m (dimension chain on A-13); total height about 37.80 m to the top of the roof parapet.
Key data and sources
Each figure with the drawing, study or standard it comes from.
| Item | Value | Source |
|---|---|---|
| Datum | Ground floor +/-0.00 | REV09 / R10 drawn |
| Basement | -4.50 | REV09 / R10 drawn |
| Guest floor to floor | 4.00 m | REV09 / R10 drawn |
| Apex | +36.00 | REV09 / R10 drawn |
| Annex | 9.0 m clear halls; section to follow | REV09 / R10 drawn |
Drawing evidence – R17 sheets
The latest issued drawings (8 November 2026). Click a sheet to open it full size.
Where it is in the RC presentation
Wafaiya_Yanbu_RC_Submission_REV09.pdf (135 pages) – click a page to open it full size.
Evidence photos
The photos attached to this item in the compliance answer sheet.
References
- R10 Architectural Plans Y5S-AR-SC-01 (A-13 cross / longitudinal sections); WFY key data levels