Systems & Services · Requirement 21 of 27

Air-conditioning system layout and unit locations

Central chilled water: air-cooled chillers on the upper roof, AHUs with heat recovery, 4-pipe fan-coil units in the rooms; typical room AC diagram.

✓ CompliedRC presentation REV09 · p. 129

Answer

System: central chilled water (recommended for a 5-star coastal hotel) - coastal-coated air-cooled chillers on the upper roof (or RCJY district-cooling interface), primary-variable pumping (BOQ 14.H.01).

Unit locations: chillers and pumps - upper roof plant zones behind screens (roof services plan); AHUs with heat-recovery wheels and DOAS fresh-air units - roof plant and podium plant rooms, serving lobby, ballroom, restaurants, spa; guest rooms and suites - 4-pipe FCUs; annex - fed from the same plant.

Typical guest room (diagram): concealed horizontal FCU above the drop ceiling at the room entrance / bathroom zone; insulated supply duct to a linear slot grille in the bulkhead; return grille in the drop ceiling; CHW / HW pipes and condensate drain to the corridor riser; DOAS fresh air from the corridor; bathroom exhaust; thermostat by the door; access panel for service.

Preliminary load about 1,800-2,000 TR (1 TR per 18-20 m2 x 36,100 m2), e.g. 4 x 500 TR duty + 1 standby - MEP to confirm.

Key data and sources

Each figure with the drawing, study or standard it comes from.

ItemValueSource
SystemCentral chilled water, primary-variableBOQ 14.H.01
PlantCoastal-coated air-cooled chillers, upper roof (or district cooling)REV09 / R10 drawn
Cooling loadabout 1,800-2,000 TR (1 TR / 18-20 m2)Prelim. - MEP to confirm
Chillers4 x 500 TR + 1 standbyPrelim. - MEP to confirm
Terminals4-pipe FCU rooms; AHU + heat-recovery wheel public areasASHRAE 62.1 / 90.1
Room design23 +/- 1 deg C, 50 % RHASHRAE 55

Drawing evidence – R17 sheets

The latest issued drawings (8 November 2026). Click a sheet to open it full size.

WFY-AR-107
WFY-AR-107Roof floor plan – hotel

Where it is in the RC presentation

Wafaiya_Yanbu_RC_Submission_REV09.pdf (135 pages) – click a page to open it full size.

Presentation page 129
Page 129
Presentation page 114
Page 114

Evidence photos

The photos attached to this item in the compliance answer sheet.

Evidence photo 1
Photo 1
Evidence photo 2
Photo 2
Evidence photo 3
Photo 3

References

  • BOQ 14.H.01 (HVAC); roof services plan P-MEP-02; typical room AC diagram; ASHRAE 55 / 62.1 / 90.1