Wafaiya YanbuRCJY answers
07

Design Requirements · Requirement 7 of 27

Distribution of circulation and functions

Guest, VIP, banquet, staff / service and annex flows are kept apart. R17 circulation and fire & life safety plans; lift traffic check – 6 guest lifts, 39.3 s interval: adequate.

✓ CompliedRC presentation REV09 · p. 11–12, 100–112, 122, 124

Answer

Horizontal flows kept separate: (1) guests - waterfall axis, porte-cochere and drop-off fountain, lobby; (2) VIP - west entry with its own lobby and lift; (3) banquet guests - own entry and pre-function hall; (4) staff, deliveries and waste - north service road to loading, BOH and basement; (5) annex - own drive-through and the glazed link bridge.

Vertical: guest lift cores in each wing, separate service / luggage lifts and service stairs to every floor pantry and linen room, protected fire stairs per wing. Function zoning colour-coded on every level.

Circulation plans R17 (8 sheets, WFY-CIR-101 to 108): short flow arrows into every space, people on the routes, shaded corridors and a bubble diagram of space relationships under each plan. Fire & life safety plans R17 (WFY-FLS) show the escape side of the same routes.

Lift traffic check (CIBSE Guide D): 6 guest lifts in 2 groups of 3, 1,275 kg / 17 persons at 2.0 m/s; round trip 117.8 s, interval 39.3 s (5-star target ≤ 40 s) and 37 % of the population moved in 5 minutes – adequate; 3 service lifts and a fire-fighting lift in each fire-fighting shaft.

Key data and sources

Each figure with the drawing, study or standard it comes from.

ItemValueSource
FlowsGuest / VIP / banquet / service / annex - separatedREV09 / R10 drawn
Drop-offPorte-cochere + drop-off fountainREV09 / R10 drawn
ServiceNorth service road - loading - basement BOHREV09 / R10 drawn
LinkGlazed bridge hotel-annexREV09 / R10 drawn

Drawing evidence – R17 sheets

The latest issued drawings (8 November 2026). Click a sheet to open it full size.

WFY-CIR-101
WFY-CIR-101Circulation plan – Basement
WFY-CIR-102
WFY-CIR-102Circulation plan – Ground floor and site
WFY-CIR-103
WFY-CIR-103Circulation plan – Mezzanine
WFY-CIR-104
WFY-CIR-104Circulation plan – First floor
WFY-CIR-105
WFY-CIR-105Circulation plan – Typical floor 2nd–4th
WFY-CIR-106
WFY-CIR-106Circulation plan – Typical floor 5th–6th
WFY-CIR-107
WFY-CIR-107Circulation plan – Roof floor
WFY-CIR-108
WFY-CIR-108Circulation plan – Annex

Where it is in the RC presentation

Wafaiya_Yanbu_RC_Submission_REV09.pdf (135 pages) – click a page to open it full size.

Presentation page 11
Page 11
Presentation page 12
Page 12
Presentation page 100
Page 100
Presentation page 102
Page 102
Presentation page 104
Page 104
Presentation page 106
Page 106
Presentation page 108
Page 108
Presentation page 110
Page 110
Presentation page 112
Page 112
Presentation page 122
Page 122
Presentation page 124
Page 124

Evidence photos

The photos attached to this item in the compliance answer sheet.

Evidence photo 1
Photo 1
Evidence photo 2
Photo 2

References

  • R10 Architectural Plans Y5S-AR-GF-01, ME-01, 1ST-01 (zoning); circulation diagram D-04