Wafaiya YanbuRCJY answers
24

Systems & Services · Requirement 24 of 27

Service locations — waste / cleaning containers

Garbage chutes on every guest floor to a basement refuse room with compactor and cool room; collection from the north service entry.

✓ CompliedRC presentation REV09 · p. 130

Answer

Garbage chutes on each guest floor to a refuse room in the basement back of house, with compactor and cool room for wet waste; collection from the north service entry.

Preliminary volume about 0.6 t/day (228 keys, 1.6 guests/key, about 1.5 kg/guest + F&B), i.e. about 5 m3/day - 2-day storage. Bin positions to be confirmed with RCJY.

Key data and sources

Each figure with the drawing, study or standard it comes from.

ItemValueSource
CollectionChute per guest wing to basement refuse roomREV09 / R10 drawn
Volumeabout 0.6 t/day, about 5 m3/dayPrelim. - MEP to confirm
Storage2 days, compactor + cooled wet-waste roomPrelim. - MEP to confirm
Pick-upNorth service entryREV09 / R10 drawn

Drawing evidence – latest sheets

The latest issued drawings: R18 architectural set, FLS and circulation plans (9 November 2026). Click a sheet to open it full size.

WFY-AR-101
WFY-AR-101Basement floor plan – hotel (incl. tanks, LEED parking)

Where it is in the RC presentation

Wafaiya_Yanbu_RC_Submission_REV09.pdf (135 pages) – click a page to open it full size.

Presentation page 130
Page 130
Presentation page 101
Page 101

Evidence photos

The photos attached to this item in the compliance answer sheet.

Evidence photo 1
Photo 1
Evidence photo 2
Photo 2

References

  • R10 Architectural Plans Y5S-AR-BA-01 (refuse room), TP-01 / TP-02 (garbage chutes); BOQ waste items
Main site